Circuit demands
Demo snapshot — build-time-generated from netops.store via netops.render-html (clojure -M:dev:render-html), regenerated nightly.
| Demand | Customer | Src node | Dst node | Jurisdiction | Lightpath | Last op status |
|---|---|---|---|---|---|---|
| req-1 | Sakura Community Network | tokyo-1 | osaka-1 | JPN | provisioned · torn down | committed |
| req-2 | Atlantis Co-op | tokyo-1 | osaka-1 | ATL | not provisioned | HARD hold · no-spec-basis |
| req-3 | 鈴木通信 | tokyo-1 | ghost-pop | JPN | not provisioned | HARD hold · route-endpoints-invalid |
| req-4 | 田中回線 | tokyo-1 | sapporo-1 | JPN | not provisioned | HARD hold · capacity-blocked |
Draft lightpath-provisioning / lightpath-teardown records
Unsigned drafts only — activating/releasing the real optical circuit is the licensed network operator's own act, outside this actor's authority (see README Actuation).
| Kind | Record id | Demand | Jurisdiction | Status |
|---|---|---|---|---|
| provisioning | JPN-PRV-000000 | req-1 | JPN | immutable draft |
| teardown | JPN-TRN-000000 | req-1 | JPN | immutable draft |
Action gate (Network Provisioning Governor)
HARD holds cannot be overridden by a human approver. Right-of-way/carrier-license spec-basis, evidence completeness, live route endpoints and route-capacity are independently recomputed, never trusted from the advisor's proposal; activating or releasing a real optical circuit is always a human network operator's call, at every rollout phase.
| Op | Gate |
|---|---|
:demand/intake | phase-3 auto-commit when clean, no capital risk yet -- the ONLY auto-eligible op in this domain |
:license/verify | ALWAYS human approval · spec-basis independently checked against netops.facts, never fabricated |
:route/screen | ALWAYS human approval when clean · a capacity-blocked route (no free DWDM wavelength) is a HARD, un-overridable hold instead |
:actuation/provision-lightpath | ALWAYS human approval · activates a real optical circuit · route endpoints independently recomputed against the live topology + double-provisioning guard enforced, never auto at any phase |
:actuation/teardown-lightpath | ALWAYS human approval · releases a real optical circuit · double-teardown guard enforced, never auto at any phase |
Audit ledger (this run)
Append-only decision-fact log — every proposal, hold and commit this scenario produced.
| Fact | Op | Subject | Basis |
|---|---|---|---|
| committed | intake | req-1 | id, customer-name |
| committed | verify | req-1 | 電気通信事業法 第9条(電気通信事業の登録) / 道路法 第32条(道路占用許可), https://www.soumu.go.jp/ |
| committed | screen | req-1 | apn-rwa |
| committed | provision-lightpath | req-1 | req-1 |
| committed | teardown-lightpath | req-1 | req-1 |
| governor-hold | verify | req-2 | no-spec-basis |
| committed | verify | req-3 | 電気通信事業法 第9条(電気通信事業の登録) / 道路法 第32条(道路占用許可), https://www.soumu.go.jp/ |
| governor-hold | provision-lightpath | req-3 | route-endpoints-invalid |
| governor-hold | screen | req-4 | capacity-blocked |