Production batches
Demo snapshot — build-time-generated from millwork.store via millwork.render-html (clojure -M:dev:render-html), regenerated nightly.
| Batch | Dimensional spec | Product type | Shipped / Quantity | Output quality | QC status | Last op status |
|---|---|---|---|---|---|---|
| batch-001 | door-single-leaf | door | 150 / 500 units | 96.0% | verified & registered | committed |
| batch-002 | window-casement | window-frame | 75 / 80 units | 92.0% | verified & registered | no activity |
| batch-003 | staircase-straight-flight | staircase | 0 / 60 units | 89.0% | unverified / unregistered | no activity |
Plant equipment
Panel saw / CNC router / tenoning machine / edge bander / finishing-line units. Maintenance may only ever be scheduled (drafted), never actuated by this actor.
| Equipment | Kind | Commission status | Last maintenance date | Last scheduled maintenance date |
|---|---|---|---|---|
| equip-001 | cnc-router | verified & registered | 2026-05-01 | 2026-08-01 |
| equip-002 | tenoning-machine | unverified / unregistered | never | none scheduled |
Action gate (Millwork Shop Plant Operations Governor)
HARD holds cannot be overridden. Equipment/batch verified & registered status and shipment unit counts are independently recomputed, never trusted from the proposal; cutting/joinery/finishing-line-equipment actuation and cutting-line-run finalization are permanently blocked.
| Op | Gate |
|---|---|
:log-production-batch | phase-3 auto-commit when clean, no physical/financial risk |
:schedule-maintenance | ALWAYS human approval · equipment verified/registered ground-truth checked, cutting-line finalize permanently blocked |
:flag-safety-concern | ALWAYS human approval · high-stakes, never auto regardless of phase |
:coordinate-shipment | ALWAYS human approval · batch verified/registered ground-truth checked, shipment unit count independently recomputed |
Audit ledger (this run)
Append-only decision-fact log — every proposal, hold and commit this scenario produced.
| Fact | Op | Subject | Basis |
|---|---|---|---|
| committed | log-production-batch | batch-001 | dimensional-spec, last-assessed |
| committed | schedule-maintenance | mnt-1 | equip-001 |
| committed | flag-safety-concern | concern-1 | equip-001 |
| committed | coordinate-shipment | ship-1 | batch-001 |
| governor-hold | schedule-maintenance | mnt-2 | equipment-not-verified |
| governor-hold | coordinate-shipment | ship-2 | batch-not-verified |
| governor-hold | coordinate-shipment | ship-3 | shipment-unit-count-exceeded |